House surround concrete footpaths and stairs

This site in Brisbane had restricted access so everything had to be prepared by hand. Not a drama at all - we love hard work! There was approximately 60m2 of paths/landings and a set of stairs to be formed up and poured. We had to install 6 drainage pits and make sure the slab was prepped and laid so the water flowed into the drains and didn't form a torrent of water down the hill in times of rain. This was plain finished concrete so we always ensure a nice tidy broom finish that is both visually appealing, and in this case, slip resistant as it was on a slope. We organised a concrete line pump to get the concrete up to the back of the house (about 35m). All in a days work (well, actually a few days).